News Support Contact

Solutions

The platform is the same in every case. What changes is the parameter set, the standard build and which differences are worth an engineer's attention.

Mobile core

EPC and 5GC estates accumulate configuration from every rollout programme that has ever touched them. Typical findings in the first collection pass are software versions that have fallen behind the standard build, timers that no longer match across nodes of the same role, and small differences between geographically redundant pairs that should be identical.

  • Software and patch level alignment across nodes of the same role
  • Timer and parameter consistency within an element role
  • Configuration parity between geographically redundant pairs
  • Naming and addressing conventions applied consistently
  • Leftover configuration from completed migrations

IP transport

Backbone and aggregation estates are where a role-based standard build pays back fastest, because the elements are numerous and genuinely meant to be identical.

  • Interface and MTU settings against the standard for the role
  • Routing policy parity across peers
  • QoS class definitions and marking policy
  • Naming conventions and interface descriptions
  • MPLS and segment routing configuration against the design

RAN

The useful comparison in RAN is often not against a fixed standard but against the planning tool. Plumbline imports the planned parameter set and reconciles it with what the elements actually report, which surfaces the cells that were changed during optimisation and never written back.

  • Cell and neighbour relation parameters against plan
  • Power, tilt and handover thresholds
  • Feature licence and feature activation consistency
  • Transport and synchronisation configuration at the site

IMS and VoLTE

IMS estates tend to be small in element count and high in consequence. Most of the value here is in change automation rather than drift volume, because the changes are infrequent and the rollback cost when one goes wrong is high.

  • Codec and media handling profiles across the core
  • Routing and translation table consistency
  • Trunk parameters and their change history
  • Parameter parity between active and standby elements

Operational reporting

Beyond the day to day, teams need to see where the configuration debt sits so they can plan work against it. Plumbline reports consistency by domain, by vendor and by element role, and tracks it over time, so a remediation programme has a number to move.

  • Consistency scored by domain, vendor and role
  • Trend over time, so remediation effort is visible
  • Exception register with ownership and expiry
  • A record of what changed, where and when, per element

Request an evaluation